De Aller-Bedste Bøger - over 12 mio. danske og engelske bøger
Levering: 1 - 2 hverdage

Phase Two Evaluation Findings

- The Segmental Concrete Channel Bridge System

Phase Two Evaluation Findingsaf Highway Innovative Technology Evaluation Center
Bag om Phase Two Evaluation Findings

Presents the second component of the HITEC technical evaluation of the J Muller International (JMI) Channel Bridge, a precast segmental overpass bridge system intended for use in either bridge replacement projects and construction. This report describes a full-scale demonstration of the technology, with emphasis on its unique aspects.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9780784405246
  • Indbinding:
  • Paperback
  • Sideantal:
  • 97
  • Udgivet:
  • 31. Juli 2001
  • Udgave:
  • Vægt:
  • 315 g.
Leveringstid: Ukendt - mangler pt.

Beskrivelse af Phase Two Evaluation Findings

Presents the second component of the HITEC technical evaluation of the J Muller International (JMI) Channel Bridge, a precast segmental overpass bridge system intended for use in either bridge replacement projects and construction. This report describes a full-scale demonstration of the technology, with emphasis on its unique aspects.

Brugerbedømmelser af Phase Two Evaluation Findings



Find lignende bøger
Bogen Phase Two Evaluation Findings findes i følgende kategorier: