Phase Two Evaluation Findings
- The Segmental Concrete Channel Bridge System
Du sparer
0%
ift. normalprisen
Spar
0%
- Indbinding:
- Paperback
- Sideantal:
- 97
- Udgivet:
- 31. Juli 2001
- Udgave:
- Vægt:
- 315 g.
Leveringstid:
Ukendt - mangler pt.
Beskrivelse af Phase Two Evaluation Findings
Presents the second component of the HITEC technical evaluation of the J Muller International (JMI) Channel Bridge, a precast segmental overpass bridge system intended for use in either bridge replacement projects and construction. This report describes a full-scale demonstration of the technology, with emphasis on its unique aspects.
Brugerbedømmelser af Phase Two Evaluation Findings
Giv din bedømmelse
For at bedømme denne bog, skal du være logget ind.Andre købte også..
Find lignende bøger
Bogen Phase Two Evaluation Findings findes i følgende kategorier:
© 2024 Pling BØGER Registered company number: DK43351621