De Aller-Bedste Bøger - over 12 mio. danske og engelske bøger
Levering: 1 - 2 hverdage

Standard Review Plan for the Review of a Reclamation Plan for Mill Tailing Sites Under Title II of the Uranium Mill Tailings Radiation Control Act of 1978

Bag om Standard Review Plan for the Review of a Reclamation Plan for Mill Tailing Sites Under Title II of the Uranium Mill Tailings Radiation Control Act of 1978

A U.S. Nuclear Regulatory Commission source and byproduct materials license is required by 10 CFR Part 40 for the Operations of uranium mills and disposal of tailings, wastes produced by the extraction or concentration of source material from ones processed primarily for their source content.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9781500113384
  • Indbinding:
  • Paperback
  • Sideantal:
  • 256
  • Udgivet:
  • 6. juni 2014
  • Størrelse:
  • 216x280x14 mm.
  • Vægt:
  • 599 g.
  • 2-3 uger.
  • 31. januar 2025
På lager

Normalpris

Abonnementspris

- Rabat på køb af fysiske bøger
- 1 valgfrit digitalt ugeblad
- 20 timers lytning og læsning
- Adgang til 70.000+ titler
- Ingen binding

Abonnementet koster 75 kr./md.
Ingen binding og kan opsiges når som helst.

Beskrivelse af Standard Review Plan for the Review of a Reclamation Plan for Mill Tailing Sites Under Title II of the Uranium Mill Tailings Radiation Control Act of 1978

A U.S. Nuclear Regulatory Commission source and byproduct materials license is required by 10 CFR Part 40 for the Operations of uranium mills and disposal of tailings, wastes produced by the extraction or concentration of source material from ones processed primarily for their source content.

Brugerbedømmelser af Standard Review Plan for the Review of a Reclamation Plan for Mill Tailing Sites Under Title II of the Uranium Mill Tailings Radiation Control Act of 1978