De Aller-Bedste Bøger - over 12 mio. danske og engelske bøger
Levering: 1 - 2 hverdage

Demonstrating the Feasibility and Reliability of Operator Manual Actions in Response to Fire

- Final Report

Bag om Demonstrating the Feasibility and Reliability of Operator Manual Actions in Response to Fire

This report provides criteria and associated technical bases for evaluating the feasibility and reliability of postfire operator manual actions implemented in nuclear power plants. The U.S. Nuclear Regulatory Commission (NRC) developed this report as a reference guide for agency staff who evaluate the acceptability of manual actions, submitted by licensees as exemption requests from the requirements of Paragraph III.G.2 of Appendix R, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979," to Title10, Part 50, "Domestic Licensing of Production and Utilization Facilities," of the Code of Federal Regulations (10 CFR Part 50), as a means of achieving and maintaining hot shutdown conditions during and after fire events. The staff may use this information in the review of future postfire operator manual actions to determine if the feasibility and reliability of the operator manual action were adequately evaluated.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9781500611132
  • Indbinding:
  • Paperback
  • Sideantal:
  • 102
  • Udgivet:
  • 22. juli 2014
  • Størrelse:
  • 216x279x5 mm.
  • Vægt:
  • 259 g.
  • 2-3 uger.
  • 23. januar 2025
På lager

Normalpris

Abonnementspris

- Rabat på køb af fysiske bøger
- 1 valgfrit digitalt ugeblad
- 20 timers lytning og læsning
- Adgang til 70.000+ titler
- Ingen binding

Abonnementet koster 75 kr./md.
Ingen binding og kan opsiges når som helst.

Beskrivelse af Demonstrating the Feasibility and Reliability of Operator Manual Actions in Response to Fire

This report provides criteria and associated technical bases for evaluating the feasibility and reliability of postfire operator manual actions implemented in nuclear power plants. The U.S. Nuclear Regulatory Commission (NRC) developed this report as a reference guide for agency staff who evaluate the acceptability of manual actions, submitted by licensees as exemption requests from the requirements of Paragraph III.G.2 of Appendix R, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979," to Title10, Part 50, "Domestic Licensing of Production and Utilization Facilities," of the Code of Federal Regulations (10 CFR Part 50), as a means of achieving and maintaining hot shutdown conditions during and after fire events. The staff may use this information in the review of future postfire operator manual actions to determine if the feasibility and reliability of the operator manual action were adequately evaluated.

Brugerbedømmelser af Demonstrating the Feasibility and Reliability of Operator Manual Actions in Response to Fire