De Aller-Bedste Bøger - over 12 mio. danske og engelske bøger
Levering: 1 - 2 hverdage

Accompanying measures for a gold mine in nearby villages

Bag om Accompanying measures for a gold mine in nearby villages

The aim of this study is to draw up a hydro-agricultural development programme for the people living near the Morila S.A. gold mine in the Sikasso region of southern Mali.The objectives are to - design and size the main works that make up the overall hydro-agricultural development plan; - estimate the overall cost of the hydro-agricultural development programme for the resources in the study area and plan its implementation.The approach adopted consists of: - carrying out a literature review on hydro-agricultural development in Morocco and Mali; - identifying the resources in the study area that can be developed; - carrying out socio-economic surveys among the people living in the study area and drawing up an overall hydro-agricultural development plan; - carrying out technical feasibility studies for the hydro-agricultural development plan selected; - estimating the overall cost of the project and planning the work.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9786207261918
  • Indbinding:
  • Paperback
  • Udgivet:
  • 13. marts 2024
  • Størrelse:
  • 152x229x6 mm.
  • Vægt:
  • 159 g.
  • 2-3 uger.
  • 23. december 2024
På lager
Forlænget returret til d. 31. januar 2025

Normalpris

Abonnementspris

- Rabat på køb af fysiske bøger
- 1 valgfrit digitalt ugeblad
- 20 timers lytning og læsning
- Adgang til 70.000+ titler
- Ingen binding

Abonnementet koster 75 kr./md.
Ingen binding og kan opsiges når som helst.

Beskrivelse af Accompanying measures for a gold mine in nearby villages

The aim of this study is to draw up a hydro-agricultural development programme for the people living near the Morila S.A. gold mine in the Sikasso region of southern Mali.The objectives are to - design and size the main works that make up the overall hydro-agricultural development plan; - estimate the overall cost of the hydro-agricultural development programme for the resources in the study area and plan its implementation.The approach adopted consists of: - carrying out a literature review on hydro-agricultural development in Morocco and Mali; - identifying the resources in the study area that can be developed; - carrying out socio-economic surveys among the people living in the study area and drawing up an overall hydro-agricultural development plan; - carrying out technical feasibility studies for the hydro-agricultural development plan selected; - estimating the overall cost of the project and planning the work.

Brugerbedømmelser af Accompanying measures for a gold mine in nearby villages



Find lignende bøger
Bogen Accompanying measures for a gold mine in nearby villages findes i følgende kategorier: